SAB Mariachi
SAB Mariachi Project /SAB Mariachi SAB Mariachi JTC was appointed for the design and detailing of the PEB structures for a 13 000m2 new Pack line and PRM warehouse at the ABInBev Rosslyn plant. The most challenging part of this project was to ensure that the new structures tie in with …