SAB Mariachi

Project /SAB Mariachi

SAB Mariachi

SAB Mariachi

JTC was appointed for the design and detailing of the PEB structures for a 13 000m2 new Pack line and PRM warehouse at the ABInBev Rosslyn plant. The most challenging part of this project was to ensure that the new structures tie in with existing buildings. In addition, erection of steel had to be sequenced and executed without influencing existing bottling operations in other pack lines.

Client: ABInBev

Main Contractor: WBHO

Steel Contractor: CBS/ Cadcon

Status: Current – Steel erection to commence after COVID 19 lockdown