CHRIS HANI BARAGWANATH HOSPITAL

Project / Chris Hani Hospital

JTC has been appointed by Ohlhorst for the design, fabrication and installation of external and service passages at the new 500 bed ICU facility at the Chris Hani Baragwanath Hospital.

chris hani baragwanath hospital

JTC has been appointed by Ohlhorst for the design, fabrication and installation of external and service passages at the new 500 bed ICU facility at the Chris Hani Baragwanath Hospital. All buildings are constructed from light steel framed structures in order to deliver the much needed hospital facility within the shortest period of time.

Client: GDID- Gauteng Department of Infrastructure
Development

Main Contractor: Enza Construction

Status: Completed